Back to Squawk list
  • 2

Flawed concrete found on Detroit Metro Airport runway

提交时间:
 
The $225-million runway that Detroit Metro Airport added in 2001 was expected to last for 30 years, but cracks and flaws in the concrete that started to show just three years after it opened have posed risks to safety and are forcing a costly reconstruction. Airports in Colorado and Nebraska have experienced similar runway issues with the problem known as alkali/silica reaction, or ASR, which causes concrete to expand and crack when exposed to moisture over time. (www.freep.com) 更多...

Sort type: [Top] [Newest]


preacher1
preacher1 5
Good old EPA
tyketto
What does the EPA have to do with this? Reading the article, alkalai/silica reaction (ASR) is responsible for this, and the contractor who won the bid for constructing the runway at KDTW cut costs by trying to mix in sand and gravel. They are responsible for this; incidentally, they are now defunct.
preacher1
preacher1 1
He did for a fact and a what you are saying is correct but in the story itself,
"The cement manufacturing industry has increasingly been under pressure to reduce their levels of harmful emissions into the atmosphere," according to an e-mail from MDOT spokesman Jeff Cranson. "This prompted them to modify their manufacturing process to incorporate a portion of the highly alkaline cement kiln dust back into their final product." Not the EPA all together but they definitely had their hand in it.

登录

还没有帐户吗? 现在就注册(免费),设置诸多自定义功能、航班提醒等等!
您知道FlightAware航班跟踪是由广告支持吗?
通过允许展示来自FlightAware.com的广告,您可以帮助我们使FlightAware保持免费。我们努力使我们的广告保持相关性,同时不显突兀,以创造一流的体验。在FlightAware上将广告加入白名单快捷而简单,或者请您考虑选择我们的高级帐户.
退出